General

Profile

Iago Dapena

  • Registered on: 06.04.2020
  • Last connection: 26.05.2025

Issues

Projects

Activity

26.05.2025

12:02 RF PLC User story #2594 (Code: Impl): Frist draft of State Machine to be implemented inPLC

06.05.2025

17:15 RF PLC User story #2592: Define communications between PLC and EPICS avoiding the use of the microbox
As suggested by Roberto we can use the S7plc EPICS driver described on https://epics.web.psi.ch/style/software/s7plc/...

05.05.2025

11:35 RF PLC User story #2592 (Code: Impl): Define communications between PLC and EPICS avoiding the use of the microbox

30.04.2025

14:35 RF PLC User story #2562: Deliverable first task plan
Version 01 of the document.
Pending points:
- Communication between RF Module Control PC and PLC
- Test bench sub...

28.04.2025

12:13 RF PLC User story #2561 (Code: Impl): Review datasheets of PS of RF system and check code of managers
12:12 RF PLC User story #2561: Review datasheets of PS of RF system and check code of managers
It is desired to log certain variables when this error occurs. However, since the installation is not currently opera...
12:07 RF PLC User story #2552: Migration of present RF PLC code from step 7 classic to TIA Portal
Modification regarding the connection names uploaded to Sharepoint.
https://f4e.sharepoint.com/:u:/r/sites/RFMcontr...

15.04.2025

16:43 RF PLC User story #2561: Review datasheets of PS of RF system and check code of managers
The PLCs SW controls the power supply by means of a *manager*. This *manager* does the following functionalities:
1....
16:43 RF PLC 8.00 hours (User story #2561 (Closed): Review datasheets of PS of RF system and check code of managers)
TDK Lambda PS analysis - DAMP Filament
10:54 RF PLC User story #2562: Deliverable first task plan
@Angela Salom we need to agree in a name for the document. What about "Modifications report for the RF module control...

Also available in: Atom